Go to Top

Washing machine taps

Washing machine taps

Product Description

Washing machine taps

Item:Washing machine taps NCS004
Material:58% brass main body,zinc alloy handle
Cartridge:Ceramic valve core
Surface Finishing:Acid-plated copper, then nickel and chrome plating (three- plating)
Certificate:ISO9001:2008 and ISO14001:2004
Salt Spray Test 24 hour, non-peeling
Cartridge Life Time:No leakage after 500,000 times using
Leakage test:100% high pressure water tested
OEM:we can produce product according to customers requirement

Processing of Washing machine taps
Feed— Casting(Forging)—Examination—Maching Processing—Examination—Appearance Polishing—Examination—Electro plating—100% testing—Assembling—100% inspected—Packing—Delivery

Why choose our Washing machine taps
1. manufacturer.Best quality & Best service with Competitive price.
2. Rich experience in production and exporting.
3.Innovation is the key to the development of our enterprise.
4.Systematic Management applied.
5. Excellent export team allow NUOTE to respond customers quickly and on time.
6.Manufacturing capacity up to 200000pcs Per Month.
7.Well equipped with modern test machines insuring reliability and endurance of products.
8.Skilled engineers and workers

Packaging & Delivery for Washing machine taps
Packaging Details: 10 PCS/PVC bag,200pcs/Master Carton,Carton Dimension:55x35x18CM,wood pallet optional Contains 24 Cartons.
Delivery Detail: 1~2 weeks After signing the contract

FAQ(Washing machine taps)
1.How to get free samples ?
A: Send your address ,your telphone number ,post code ,and express account number to our mail box .and told us which model of samples you need .
2.Who pay for the express cost ?
A: We can support you free samples each model 1-3 pcs ,and we do not pay for express cost .
3.How to pay if  you buy Washing machine taps from us ?
A:We support transfer money by T/T and paypal.
4.Whats the quality assurance we provided and how do we control quality of Washing machine taps?
I. Established a procedure to check products at all stages of the manufacturing process – raw materials, in-process materials, validated or tested materials, finished goods, etc. Besides, we have also developed a procedure which identifies the inspection and test status of all items at all stages of the manufacturing process.
II. 100% inspection in assembly lines. All controls, inspections, equipment, fixtures, total production resources and skills are inspected to ensure they consistently achieve the required quality levels

Your Name (required)

Your Email (required)

Subject

Your Message